v3-concert-prewarm-budget.v1 is the release gate for the V3/V3_TODOS.md §67 scheduled concert pre-warm item.

Gate#

  • Scope: scheduled Saraswati stadium concerts served through Tier-1/Pixel Streaming plus CDN asset delivery.
  • Relay planner route: /api/v3/pxstream/concert/prewarm/plan.
  • CDN asset pre-warm lead: at least 15 minutes before scheduled start.
  • Pixel Streaming worker pre-warm lead: at least 30 minutes before scheduled start.
  • Load-test shape: 4,000 scheduled concert joins across five POPs.
  • Required cached asset groups: six concert asset groups.
  • Cold-join reduction: at least 50% versus cold baseline.

Evidence#

V3/validation/concert-prewarm-validation.json records the relay planner load test with CDN assets scheduled 900 seconds before start, Pixel Streaming workers scheduled 1,800 seconds before start, 4,000 ready pre-warmed workers, baseline cold-join p95 of 7,789 ms, pre-warmed cold-join p95 of 3,423 ms, and cold-join reduction of 5,605 basis points.

Run pnpm verify:v3 concert-prewarm before release. The verifier fails closed if the planner route, lead windows, asset count, worker count, load-test reduction, evidence, or TODO lock is missing or weakened.