  • Total tickets: 258
  • Priority split: P0=90, P1=131, P2=37
  • Phase split: Phase 0=82, Phase 1=36, Phase 2=65, Phase 3=75

Ticket List#

Global Definition of Done#

  • ISIS-0001 | DOD-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | All P0, P1, and P2 findings from the audit are closed with linked PRs.
  • ISIS-0002 | DOD-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | No simulated/placeholder runtime behavior remains in production profiles.
  • ISIS-0003 | DOD-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | API, SDK, worker, and web app contracts are aligned and versioned.
  • ISIS-0004 | DOD-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | Full observability exists for job lifecycle, cost, latency, and failure
  • ISIS-0005 | DOD-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | CI gates block regressions on schema compatibility, execution path, and
  • ISIS-0006 | DOD-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | All 45 workflow IDs are certified end-to-end (schema -> execution ->

Workstream 00: Program Governance and Delivery Controls#

  • ISIS-0007 | WS00-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | Create an Isis remediation epic with one ticket per checklist
  • ISIS-0008 | WS00-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | Assign accountable owner for each finding (F01-F22).
  • ISIS-0009 | WS00-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | Define target milestones for Phase 0/1/2/3 with explicit dates.
  • ISIS-0010 | WS00-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | Create a risk board for execution, infra, and cost regressions.
  • ISIS-0011 | WS00-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | Add architecture decision records (ADRs) for queueing model,
  • ISIS-0012 | WS00-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | Define rollback criteria for all production rollouts.
  • ISIS-0013 | WS00-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | Define release quality bar and sign-off matrix (backend,
  • ISIS-0014 | WS00-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/core-team | Add weekly status report template with burn-down by finding.

Workstream 01 (F01): Job Submission to Execution Pipeline (P0)#

  • ISIS-0015 | F01-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Define canonical job envelope schema in a shared package
  • ISIS-0016 | F01-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add BullMQ queue producer module to generation API.
  • ISIS-0017 | F01-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Publish queue name and redis config as strict required env vars
  • ISIS-0018 | F01-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Enqueue on submit and persist status transition to queued.
  • ISIS-0019 | F01-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add transactional outbox pattern so DB write and enqueue cannot
  • ISIS-0020 | F01-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add idempotency key handling to prevent duplicate enqueues.
  • ISIS-0021 | F01-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Ensure cancellation removes queued jobs and marks cancelled
  • ISIS-0022 | F01-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add retry policy with capped attempts and exponential backoff.
  • ISIS-0023 | F01-009 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add dead-letter queue with retention policy and replay tooling.
  • ISIS-0024 | F01-010 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Emit lifecycle events for
  • ISIS-0025 | F01-011 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Ensure worker ACK/NACK semantics update API-side job status
  • ISIS-0026 | F01-012 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add queue position endpoint backed by queue state, not only DB
  • ISIS-0027 | F01-013 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add queue drain/health admin operation with auth guard.
  • ISIS-0028 | F01-014 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add migration/cleanup for legacy pending jobs stuck before
  • ISIS-0029 | F01-015 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add load tests for enqueue throughput and worker consumption.

Workstream 02 (F02): Workflow Catalog Runtime Integration (P0)#

  • ISIS-0030 | F02-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add startup bootstrap to register all entries from
  • ISIS-0031 | F02-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Remove hardcoded executor default IDs not present in registry.
  • ISIS-0032 | F02-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Map each generation type to valid catalog workflow IDs.
  • ISIS-0033 | F02-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add validation to fail startup if mapped defaults are missing.
  • ISIS-0034 | F02-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add runtime guard to fail closed on unresolved workflow in
  • ISIS-0035 | F02-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add per-workflow capability metadata (input schema, output
  • ISIS-0036 | F02-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add deterministic workflow selection policy (user override >
  • ISIS-0037 | F02-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add workflow cache warm-up at service boot.
  • ISIS-0038 | F02-009 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add resolver metrics (resolve_success, resolve_failure,
  • ISIS-0039 | F02-010 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Remove placeholder output URL generation in executor production

Workstream 03 (F03): Canonical Workflow Schema and Interop (P0)#

  • ISIS-0040 | F03-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Choose canonical Isis workflow format (object-map nodes vs array
  • ISIS-0041 | F03-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Publish schema v1.0 with strict compatibility rules.
  • ISIS-0042 | F03-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Refactor workflow-registry validator to support canonical
  • ISIS-0043 | F03-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | If dual support is required, implement reversible adapter with
  • ISIS-0044 | F03-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Migrate all 45 workflows to canonical format if needed.
  • ISIS-0045 | F03-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add contract test: every workflow in
  • ISIS-0046 | F03-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add contract test: registry-exported workflow can execute via
  • ISIS-0047 | F03-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add schema lint rule in CI to block non-canonical workflow
  • ISIS-0048 | F03-009 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add schema version field and migration registry.
  • ISIS-0049 | F03-010 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add docs for custom node contracts and required fields.

Workstream 04 (F04): Isis Web App Full Feature Exposure (P0)#

  • ISIS-0050 | F04-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Create apps/isis/web application scaffold with routing, auth,
  • ISIS-0051 | F04-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add tenant-aware authentication and RBAC.
  • ISIS-0052 | F04-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add jobs dashboard (list, filter, sort, status, cancel, retry,
  • ISIS-0053 | F04-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add job submission studio supporting all generation types.
  • ISIS-0054 | F04-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add workflow catalog page (search/filter/category/tag/GPU
  • ISIS-0055 | F04-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add workflow details page (metadata, schema, node graph
  • ISIS-0056 | F04-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add workflow create/edit UI with validation feedback.
  • ISIS-0057 | F04-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add workflow version management UI
  • ISIS-0058 | F04-009 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add templates page and create-from-template flow.
  • ISIS-0059 | F04-010 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add workflow run UI with parameter forms generated from schema.
  • ISIS-0060 | F04-011 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add outputs registry page (list/get/update/delete/batch-delete).
  • ISIS-0061 | F04-012 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add output storage operations UI (download URL, upload URL, move
  • ISIS-0062 | F04-013 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add provenance editor and visualization.
  • ISIS-0063 | F04-014 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add lineage graph explorer (ancestors/descendants/both, depth
  • ISIS-0064 | F04-015 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add retention policy management UI.
  • ISIS-0065 | F04-016 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add models page (register, upload complete, list, update,
  • ISIS-0066 | F04-017 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add provider operations page (queue stats, health, failover
  • ISIS-0067 | F04-018 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add RunPod operations page (cost, usage, active endpoints,
  • ISIS-0068 | F04-019 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add live job progress updates via polling or SSE.
  • ISIS-0069 | F04-020 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add complete audit log panel for workflow and model changes.
  • ISIS-0070 | F04-021 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add feature flags panel (read-only in prod) for provider routing
  • ISIS-0071 | F04-022 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add error state UX for all failure categories
  • ISIS-0072 | F04-023 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add empty states, skeleton loading states, and retry actions
  • ISIS-0073 | F04-024 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add mobile-responsive layouts for core operational pages.
  • ISIS-0074 | F04-025 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add accessibility compliance checks (keyboard navigation, aria

Workstream 05 (F05): RunPod Adapter Productionization (P1)#

  • ISIS-0075 | F05-001 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement real estimateCost() using GPU pricing + measured
  • ISIS-0076 | F05-002 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement real getCredits() integration path (or internal
  • ISIS-0077 | F05-003 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement persistent getJobHistory() with indexed query
  • ISIS-0078 | F05-004 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement model inventory endpoint for baked endpoint images.
  • ISIS-0079 | F05-005 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement custom node inventory endpoint for baked endpoint
  • ISIS-0080 | F05-006 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Replace synthetic timestamps with provider-sourced timestamps
  • ISIS-0081 | F05-007 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add status mapping contract tests for every RunPod status
  • ISIS-0082 | F05-008 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add retry/circuit-breaker tests for rate limit, timeout, auth
  • ISIS-0083 | F05-009 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add provider error taxonomy mapping to user-safe messages and
  • ISIS-0084 | F05-010 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add tracing context propagation (correlationId, projectId,

Workstream 06 (F06): RunPod Handler Capability Expansion (P1)#

  • ISIS-0085 | F06-001 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add workflow-id driven execution mode for catalog-native
  • ISIS-0086 | F06-002 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add endpoint that returns supported workflow IDs and metadata.
  • ISIS-0087 | F06-003 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add typed contracts for major Isis categories (video, 3d,
  • ISIS-0088 | F06-004 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add schema validation for workflow overrides and input images
  • ISIS-0089 | F06-005 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add compatibility checks for required custom nodes/models before
  • ISIS-0090 | F06-006 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add deterministic error response format for unsupported
  • ISIS-0091 | F06-007 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add execution limits per workflow class
  • ISIS-0092 | F06-008 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add test fixtures for each major category.

Workstream 07 (F07): Remove Simulated Runtime Behavior from Executors (P1)#

  • ISIS-0093 | F07-001 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add production guard: simulated paths must be disabled in
  • ISIS-0094 | F07-002 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Texture Upscale: integrate real model inference backend and
  • ISIS-0095 | F07-003 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Gaussian Splatting: integrate real reconstruction pipeline and
  • ISIS-0096 | F07-004 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Blender Render: enforce Blender dependency check at startup and
  • ISIS-0097 | F07-005 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Mesh Processing: replace simulated operations with real
  • ISIS-0098 | F07-006 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add golden-output tests for each executor.
  • ISIS-0099 | F07-007 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add output checksum and file integrity verification after
  • ISIS-0100 | F07-008 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add performance benchmarks and min throughput targets per
  • ISIS-0101 | F07-009 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add cancellation tests for long-running operations.
  • ISIS-0102 | F07-010 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add resource leak tests (VRAM, temp files, subprocess cleanup).

Workstream 08 (F08): RunPod Provisioning and Drift Control (P1)#

  • ISIS-0103 | F08-001 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/devops | Decide provisioning mechanism (Terraform provider/external
  • ISIS-0104 | F08-002 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/devops | Implement endpoint lifecycle automation (create/update/delete).
  • ISIS-0105 | F08-003 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/devops | Store endpoint desired state in code (GPU type, min/max workers,
  • ISIS-0106 | F08-004 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/devops | Add drift detection comparing desired state vs actual endpoint
  • ISIS-0107 | F08-005 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/devops | Add reconcile command for drift remediation.
  • ISIS-0108 | F08-006 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/devops | Add CI validation for runpod endpoint definitions before deploy.
  • ISIS-0109 | F08-007 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/devops | Add staged rollout by endpoint with canary traffic percentages.
  • ISIS-0110 | F08-008 | P1 | Phase 1 | M1 RunPod Productionization (2026-03-23 to 2026-04-17) | @oshun/devops | Add on-call runbook for endpoint outages and cost spikes.

Workstream 09 (F09): Workflow Registry Persistence and Auth Hardening (P2)#

  • ISIS-0111 | F09-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Replace in-memory storage with PostgreSQL persistence.
  • ISIS-0112 | F09-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add migrations for workflows, versions, templates, stars, runs,
  • ISIS-0113 | F09-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Remove DEFAULT_OWNER = 'user_demo' and source owner from auth
  • ISIS-0114 | F09-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add RBAC checks for create/update/delete/version operations.
  • ISIS-0115 | F09-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add optimistic locking/version conflict handling on updates.
  • ISIS-0116 | F09-006 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add pagination + indexing for large catalogs.
  • ISIS-0117 | F09-007 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add soft-delete + restore support for workflows and versions.
  • ISIS-0118 | F09-008 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add audit trail for all write operations.

Workstream 10 (F10): Output Registry Ownership and Access Control (P2)#

  • ISIS-0119 | F10-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Remove DEFAULT_OWNER = 'user_demo' and enforce authenticated
  • ISIS-0120 | F10-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add row-level authorization checks for
  • ISIS-0121 | F10-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add tenant scoping in all list and graph queries.
  • ISIS-0122 | F10-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add policy enforcement for cross-project lineage links.
  • ISIS-0123 | F10-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add audit logging for provenance and lineage mutations.

Workstream 11 (F11): Health and Readiness Truthfulness (P2)#

  • ISIS-0124 | F11-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Replace placeholder readiness values for queue/storage with real
  • ISIS-0125 | F11-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add Redis connectivity and queue liveness probe.
  • ISIS-0126 | F11-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add object storage read/write probe with timeout and retries.
  • ISIS-0127 | F11-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add provider health check with dependency-specific status
  • ISIS-0128 | F11-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Ensure readiness endpoint returns 503 on critical dependency
  • ISIS-0129 | F11-006 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add alerting based on readiness degradation.

Workstream 12 (F12): Model Storage Presign Productionization (P2)#

  • ISIS-0130 | F12-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Integrate real pre-signed upload URL generation via
  • ISIS-0131 | F12-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Integrate real pre-signed download URL generation via
  • ISIS-0132 | F12-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add content hash verification step on completeUpload.
  • ISIS-0133 | F12-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Enforce MIME/type and size constraints at upload and completion.
  • ISIS-0134 | F12-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add anti-virus/malware scan hook for uploaded model files.
  • ISIS-0135 | F12-006 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add retention/cleanup policy for abandoned uploads.

Workstream 13 (F13): Deployment Configuration Drift (P2)#

  • ISIS-0136 | F13-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Update docker compose Isis app paths to
  • ISIS-0137 | F13-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add CI check to validate APP_PATH values exist for all compose
  • ISIS-0138 | F13-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add smoke test that boots Isis services via compose and verifies
  • ISIS-0139 | F13-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Document local startup workflow for Isis services and GPU

Workstream 14 (F14): Test Coverage Expansion for Real Execution (P2)#

  • ISIS-0140 | F14-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add full E2E test: submit job -> queue -> worker -> output ->
  • ISIS-0141 | F14-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add E2E test for cancel during queued and running states.
  • ISIS-0142 | F14-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add E2E test for retry flow with bounded attempts.
  • ISIS-0143 | F14-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add contract test for all 45 workflows executing validation +
  • ISIS-0144 | F14-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add RunPod sandbox integration tests for submit/status/cancel.
  • ISIS-0145 | F14-006 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add cost-accounting correctness tests with fixture runtimes.
  • ISIS-0146 | F14-007 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add web app E2E tests covering every major interaction surface.
  • ISIS-0147 | F14-008 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add chaos tests for provider failover and queue outage handling.

Workstream 15 (F15): API and SDK Contract Parity (Critical Completeness)#

  • ISIS-0148 | F15-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Inventory all @isis/client methods and map to live API routes.
  • ISIS-0149 | F15-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Resolve generation route mismatches (/api/v1/jobs/batch,
  • ISIS-0150 | F15-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Resolve workflows route mismatches
  • ISIS-0151 | F15-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Resolve outputs route mismatches (batch-delete,
  • ISIS-0152 | F15-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Decide whether to add missing endpoints or deprecate unsupported
  • ISIS-0153 | F15-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add OpenAPI specs for generation/workflow/output services.
  • ISIS-0154 | F15-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Generate SDK from OpenAPI or add CI contract tests to prevent
  • ISIS-0155 | F15-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to 2026-03-20) | @oshun/isis-team | Add breaking-change detection job in CI for API route contracts.

Workstream 16: Security and Multi-Tenant Hardening#

  • ISIS-0156 | SEC-001 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/security | Add auth middleware consistency across generation, workflow,
  • ISIS-0157 | SEC-002 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/security | Enforce project-level authorization on every read/write route.
  • ISIS-0158 | SEC-003 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/security | Add API key scopes for admin/ops/provider-control actions.
  • ISIS-0159 | SEC-004 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/security | Add webhook signature verification for provider callbacks.
  • ISIS-0160 | SEC-005 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/security | Add input sanitization and payload size limits on workflow
  • ISIS-0161 | SEC-006 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/security | Add structured security logs for sensitive operations.
  • ISIS-0162 | SEC-007 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/security | Add abuse controls for expensive generation endpoints.

Workstream 17: Observability, Cost, and SLOs#

  • ISIS-0163 | OBS-001 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/platform | Define SLOs for submit latency, queue delay, execution success
  • ISIS-0164 | OBS-002 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/platform | Add metrics for queue depth, stuck jobs, execution retries, and
  • ISIS-0165 | OBS-003 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/platform | Add per-provider latency and failure dashboards.
  • ISIS-0166 | OBS-004 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/platform | Add cost dashboards by endpoint, project, workflow, and user.
  • ISIS-0167 | OBS-005 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/platform | Add anomaly alerts for cost spikes and failure rates.
  • ISIS-0168 | OBS-006 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/platform | Add distributed tracing across API -> queue -> worker ->
  • ISIS-0169 | OBS-007 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/platform | Add operator CLI commands for stuck-job triage and replay.

Workstream 18: Data Migration and Backfill#

  • ISIS-0170 | MIG-001 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Design migration for existing jobs to new lifecycle/status
  • ISIS-0171 | MIG-002 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Backfill workflow IDs for historical jobs where missing.
  • ISIS-0172 | MIG-003 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Backfill provenance records for completed outputs where
  • ISIS-0173 | MIG-004 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Backfill cost data from historical provider logs.
  • ISIS-0174 | MIG-005 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Add migration rollback and verification scripts.

Workstream 19: Release Plan and Cutover#

  • ISIS-0175 | REL-001 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Enable queue producer behind feature flag for safe rollout.
  • ISIS-0176 | REL-002 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Canary release to limited traffic/project set.
  • ISIS-0177 | REL-003 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Verify SLO and cost behavior during canary.
  • ISIS-0178 | REL-004 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Gradually increase rollout percentage with auto-rollback
  • ISIS-0179 | REL-005 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Conduct game-day exercises before full cutover.
  • ISIS-0180 | REL-006 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Finalize post-cutover validation checklist and sign-off.

Workstream 20: Per-Workflow End-to-End Certification (45/45)#

  • ISIS-0181 | WF-001 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | 3d-texture: certify schema validity, resolver mapping, executor
  • ISIS-0182 | WF-002 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | animatediff-controlnet: certify schema validity, resolver
  • ISIS-0183 | WF-003 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | artifact-reconstruction: certify schema validity, resolver
  • ISIS-0184 | WF-004 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | background-removal: certify schema validity, resolver mapping,
  • ISIS-0185 | WF-005 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | barnsley-fern: certify schema validity, resolver mapping,
  • ISIS-0186 | WF-006 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | base-avatar: certify schema validity, resolver mapping, executor
  • ISIS-0187 | WF-007 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | batch-resize: certify schema validity, resolver mapping, executor
  • ISIS-0188 | WF-008 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | batch-watermark: certify schema validity, resolver mapping,
  • ISIS-0189 | WF-009 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | buddhist-thangka: certify schema validity, resolver mapping,
  • ISIS-0190 | WF-010 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | celtic-knotwork: certify schema validity, resolver mapping,
  • ISIS-0191 | WF-011 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | christian-icon: certify schema validity, resolver mapping,
  • ISIS-0192 | WF-012 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | concept-explainer: certify schema validity, resolver mapping,
  • ISIS-0193 | WF-013 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | consciousness-map: certify schema validity, resolver mapping,
  • ISIS-0194 | WF-014 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | consistent-character: certify schema validity, resolver mapping,
  • ISIS-0195 | WF-015 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | cosmetic-layer: certify schema validity, resolver mapping,
  • ISIS-0196 | WF-016 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | egyptian-hieratic: certify schema validity, resolver mapping,
  • ISIS-0197 | WF-017 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | environment-map: certify schema validity, resolver mapping,
  • ISIS-0198 | WF-018 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | face-swap: certify schema validity, resolver mapping, executor
  • ISIS-0199 | WF-019 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | flame-fractal: certify schema validity, resolver mapping,
  • ISIS-0200 | WF-020 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | fractal-art-fusion: certify schema validity, resolver mapping,
  • ISIS-0201 | WF-021 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | fractal-morph: certify schema validity, resolver mapping,
  • ISIS-0202 | WF-022 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | fractal-zoom: certify schema validity, resolver mapping, executor
  • ISIS-0203 | WF-023 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | guided-journey: certify schema validity, resolver mapping,
  • ISIS-0204 | WF-024 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | hindu-deity: certify schema validity, resolver mapping, executor
  • ISIS-0205 | WF-025 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | image-to-video: certify schema validity, resolver mapping,
  • ISIS-0206 | WF-026 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | islamic-geometric: certify schema validity, resolver mapping,
  • ISIS-0207 | WF-027 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | julia: certify schema validity, resolver mapping, executor
  • ISIS-0208 | WF-028 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | lecture-scene: certify schema validity, resolver mapping,
  • ISIS-0209 | WF-029 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | lorenz-attractor: certify schema validity, resolver mapping,
  • ISIS-0210 | WF-030 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | mandala-3d: certify schema validity, resolver mapping, executor
  • ISIS-0211 | WF-031 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | mandala-animated: certify schema validity, resolver mapping,
  • ISIS-0212 | WF-032 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | mandala-generator: certify schema validity, resolver mapping,
  • ISIS-0213 | WF-033 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | mandala-personalized: certify schema validity, resolver mapping,
  • ISIS-0214 | WF-034 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | mandelbrot: certify schema validity, resolver mapping, executor
  • ISIS-0215 | WF-035 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | meditation-scene: certify schema validity, resolver mapping,
  • ISIS-0216 | WF-036 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | nft-art: certify schema validity, resolver mapping, executor
  • ISIS-0217 | WF-037 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | print-ready: certify schema validity, resolver mapping, executor
  • ISIS-0218 | WF-038 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | rarity-enhancer: certify schema validity, resolver mapping,
  • ISIS-0219 | WF-039 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | shamanic-vision: certify schema validity, resolver mapping,
  • ISIS-0220 | WF-040 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | spiritual-teacher: certify schema validity, resolver mapping,
  • ISIS-0221 | WF-041 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | stable-zero123: certify schema validity, resolver mapping,
  • ISIS-0222 | WF-042 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | style-transfer: certify schema validity, resolver mapping,
  • ISIS-0223 | WF-043 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | upscale-enhance: certify schema validity, resolver mapping,
  • ISIS-0224 | WF-044 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | visionary-art: certify schema validity, resolver mapping,
  • ISIS-0225 | WF-045 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | yantra-generator: certify schema validity, resolver mapping,

Workstream 21: Interaction and User-Journey Coverage (No Interaction Missed)#

  • ISIS-0226 | UX-001 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Anonymous user journey: confirm blocked access to protected
  • ISIS-0227 | UX-002 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Authenticated job create -> monitor -> cancel journey works for
  • ISIS-0228 | UX-003 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Authenticated workflow authoring journey works (create ->
  • ISIS-0229 | UX-004 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Authenticated output journey works (discover -> provenance
  • ISIS-0230 | UX-005 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Model management journey works (register -> upload -> complete ->
  • ISIS-0231 | UX-006 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Provider failover journey is visible and understandable to
  • ISIS-0232 | UX-007 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | RunPod quota/cost warning journey is visible before expensive
  • ISIS-0233 | UX-008 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Failure recovery journey works (retry, clone config, report
  • ISIS-0234 | UX-009 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Cross-project/tenant boundaries are enforced in every user
  • ISIS-0235 | UX-010 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Every UI interaction has corresponding API route test and

Workstream 22: Operational Resilience and Compliance Completion#

  • ISIS-0236 | OPS-001 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add database backup/restore runbooks and recovery time
  • ISIS-0237 | OPS-002 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add secrets rotation procedures for RunPod API keys and webhook
  • ISIS-0238 | OPS-003 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add disaster recovery drill for provider outage (RunPod
  • ISIS-0239 | OPS-004 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add budget guardrails and automatic throttling when RunPod spend
  • ISIS-0240 | OPS-005 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add data retention and deletion compliance checks for outputs,
  • ISIS-0241 | OPS-006 | P1 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add post-incident review template specific to generation

Web App Feature Parity Checklist (No Feature Missed)#

  • ISIS-0242 | PARITY-001 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every method in GenerationResource is accessible via UI
  • ISIS-0243 | PARITY-002 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every method in WorkflowsResource is accessible via UI
  • ISIS-0244 | PARITY-003 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every method in OutputsResource is accessible via UI flow.
  • ISIS-0245 | PARITY-004 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every model management endpoint is accessible via UI flow.
  • ISIS-0246 | PARITY-005 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every RunPod operations endpoint is accessible via UI or
  • ISIS-0247 | PARITY-006 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every long-running action has user-visible progress state.
  • ISIS-0248 | PARITY-007 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every destructive action has confirmation + undo/restore path
  • ISIS-0249 | PARITY-008 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every page has empty/loading/error states.
  • ISIS-0250 | PARITY-009 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every UI action emits analytics/audit events.

Mandatory Exit Gates#

  • ISIS-0251 | GATE-001 | P0 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | End-to-end production-like workflow run passes for each catalog
  • ISIS-0252 | GATE-002 | P0 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | 45/45 workflow definitions pass canonical schema and registry
  • ISIS-0253 | GATE-003 | P0 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | No simulated output generation is reachable in production
  • ISIS-0254 | GATE-004 | P0 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | RunPod cost and history data are complete and queryable per
  • ISIS-0255 | GATE-005 | P0 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | Isis web app demonstrates full feature parity in UAT checklist.
  • ISIS-0256 | GATE-006 | P0 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | Security review complete with no critical/high unresolved
  • ISIS-0257 | GATE-007 | P0 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | Observability dashboards and alerts are live and validated.
  • ISIS-0258 | GATE-008 | P0 | Phase 3 | M3 Certification and Operational Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | Regression suite is green on CI for backend, worker, infra, and