# ISIS Remediation Backlog

This backlog is generated from `ISIS_TODOS.md` with a strict 1:1 ticket mapping
for each checklist item.

- Total tickets: **258**
- Priority split: P0=90, P1=131, P2=37
- Phase split: Phase 0=82, Phase 1=36, Phase 2=65, Phase 3=75

## Ticket List

### Global Definition of Done

- [x] ISIS-0001 | DOD-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | All P0, P1, and P2 findings from the
      audit are closed with linked PRs.
- [x] ISIS-0002 | DOD-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | No simulated/placeholder runtime behavior
      remains in production profiles.
- [x] ISIS-0003 | DOD-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | API, SDK, worker, and web app contracts
      are aligned and versioned.
- [x] ISIS-0004 | DOD-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | Full observability exists for job
      lifecycle, cost, latency, and failure
- [x] ISIS-0005 | DOD-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | CI gates block regressions on schema
      compatibility, execution path, and
- [x] ISIS-0006 | DOD-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | All 45 workflow IDs are certified
      end-to-end (schema -> execution ->

### Workstream 00: Program Governance and Delivery Controls

- [x] ISIS-0007 | WS00-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | Create an Isis remediation epic with one
      ticket per checklist
- [x] ISIS-0008 | WS00-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | Assign accountable owner for each finding
      (F01-F22).
- [x] ISIS-0009 | WS00-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | Define target milestones for Phase
      0/1/2/3 with explicit dates.
- [x] ISIS-0010 | WS00-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | Create a risk board for execution, infra,
      and cost regressions.
- [x] ISIS-0011 | WS00-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | Add architecture decision records (ADRs)
      for queueing model,
- [x] ISIS-0012 | WS00-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | Define rollback criteria for all
      production rollouts.
- [x] ISIS-0013 | WS00-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | Define release quality bar and sign-off
      matrix (backend,
- [x] ISIS-0014 | WS00-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/core-team | Add weekly status report template with
      burn-down by finding.

### Workstream 01 (F01): Job Submission to Execution Pipeline (P0)

- [x] ISIS-0015 | F01-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Define canonical job envelope schema in a
      shared package
- [x] ISIS-0016 | F01-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add BullMQ queue producer module to
      generation API.
- [x] ISIS-0017 | F01-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Publish queue name and redis config as
      strict required env vars
- [x] ISIS-0018 | F01-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Enqueue on submit and persist status
      transition to `queued`.
- [x] ISIS-0019 | F01-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add transactional outbox pattern so DB
      write and enqueue cannot
- [x] ISIS-0020 | F01-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add idempotency key handling to prevent
      duplicate enqueues.
- [x] ISIS-0021 | F01-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Ensure cancellation removes queued jobs
      and marks cancelled
- [x] ISIS-0022 | F01-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add retry policy with capped attempts and
      exponential backoff.
- [x] ISIS-0023 | F01-009 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add dead-letter queue with retention
      policy and replay tooling.
- [x] ISIS-0024 | F01-010 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Emit lifecycle events for
- [x] ISIS-0025 | F01-011 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Ensure worker ACK/NACK semantics update
      API-side job status
- [x] ISIS-0026 | F01-012 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add queue position endpoint backed by
      queue state, not only DB
- [x] ISIS-0027 | F01-013 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add queue drain/health admin operation
      with auth guard.
- [x] ISIS-0028 | F01-014 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add migration/cleanup for legacy
      `pending` jobs stuck before
- [x] ISIS-0029 | F01-015 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add load tests for enqueue throughput and
      worker consumption.

### Workstream 02 (F02): Workflow Catalog Runtime Integration (P0)

- [x] ISIS-0030 | F02-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add startup bootstrap to register all
      entries from
- [x] ISIS-0031 | F02-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Remove hardcoded executor default IDs not
      present in registry.
- [x] ISIS-0032 | F02-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Map each generation type to valid catalog
      workflow IDs.
- [x] ISIS-0033 | F02-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add validation to fail startup if mapped
      defaults are missing.
- [x] ISIS-0034 | F02-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add runtime guard to fail closed on
      unresolved workflow in
- [x] ISIS-0035 | F02-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add per-workflow capability metadata
      (input schema, output
- [x] ISIS-0036 | F02-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add deterministic workflow selection
      policy (user override >
- [x] ISIS-0037 | F02-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add workflow cache warm-up at service
      boot.
- [x] ISIS-0038 | F02-009 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add resolver metrics (`resolve_success`,
      `resolve_failure`,
- [x] ISIS-0039 | F02-010 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Remove placeholder output URL generation
      in executor production

### Workstream 03 (F03): Canonical Workflow Schema and Interop (P0)

- [x] ISIS-0040 | F03-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Choose canonical Isis workflow format
      (object-map nodes vs array
- [x] ISIS-0041 | F03-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Publish schema v1.0 with strict
      compatibility rules.
- [x] ISIS-0042 | F03-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Refactor workflow-registry validator to
      support canonical
- [x] ISIS-0043 | F03-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | If dual support is required, implement
      reversible adapter with
- [x] ISIS-0044 | F03-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Migrate all 45 workflows to canonical
      format if needed.
- [x] ISIS-0045 | F03-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add contract test: every workflow in
- [x] ISIS-0046 | F03-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add contract test: registry-exported
      workflow can execute via
- [x] ISIS-0047 | F03-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add schema lint rule in CI to block
      non-canonical workflow
- [x] ISIS-0048 | F03-009 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add schema version field and migration
      registry.
- [x] ISIS-0049 | F03-010 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add docs for custom node contracts and
      required fields.

### Workstream 04 (F04): Isis Web App Full Feature Exposure (P0)

- [x] ISIS-0050 | F04-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Create `apps/isis/web` application
      scaffold with routing, auth,
- [x] ISIS-0051 | F04-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add tenant-aware authentication and RBAC.
- [x] ISIS-0052 | F04-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add jobs dashboard (list, filter, sort,
      status, cancel, retry,
- [x] ISIS-0053 | F04-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add job submission studio supporting all
      generation types.
- [x] ISIS-0054 | F04-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add workflow catalog page
      (search/filter/category/tag/GPU
- [x] ISIS-0055 | F04-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add workflow details page (metadata,
      schema, node graph
- [x] ISIS-0056 | F04-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add workflow create/edit UI with
      validation feedback.
- [x] ISIS-0057 | F04-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add workflow version management UI
- [x] ISIS-0058 | F04-009 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add templates page and
      create-from-template flow.
- [x] ISIS-0059 | F04-010 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add workflow run UI with parameter forms
      generated from schema.
- [x] ISIS-0060 | F04-011 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add outputs registry page
      (list/get/update/delete/batch-delete).
- [x] ISIS-0061 | F04-012 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add output storage operations UI
      (download URL, upload URL, move
- [x] ISIS-0062 | F04-013 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add provenance editor and visualization.
- [x] ISIS-0063 | F04-014 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add lineage graph explorer
      (ancestors/descendants/both, depth
- [x] ISIS-0064 | F04-015 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add retention policy management UI.
- [x] ISIS-0065 | F04-016 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add models page (register, upload
      complete, list, update,
- [x] ISIS-0066 | F04-017 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add provider operations page (queue
      stats, health, failover
- [x] ISIS-0067 | F04-018 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add RunPod operations page (cost, usage,
      active endpoints,
- [x] ISIS-0068 | F04-019 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add live job progress updates via polling
      or SSE.
- [x] ISIS-0069 | F04-020 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add complete audit log panel for workflow
      and model changes.
- [x] ISIS-0070 | F04-021 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add feature flags panel (read-only in
      prod) for provider routing
- [x] ISIS-0071 | F04-022 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add error state UX for all failure
      categories
- [x] ISIS-0072 | F04-023 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add empty states, skeleton loading
      states, and retry actions
- [x] ISIS-0073 | F04-024 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add mobile-responsive layouts for core
      operational pages.
- [x] ISIS-0074 | F04-025 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add accessibility compliance checks
      (keyboard navigation, aria

### Workstream 05 (F05): RunPod Adapter Productionization (P1)

- [x] ISIS-0075 | F05-001 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement real
      `estimateCost()` using GPU pricing + measured
- [x] ISIS-0076 | F05-002 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement real
      `getCredits()` integration path (or internal
- [x] ISIS-0077 | F05-003 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement persistent
      `getJobHistory()` with indexed query
- [x] ISIS-0078 | F05-004 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement model inventory
      endpoint for baked endpoint images.
- [x] ISIS-0079 | F05-005 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Implement custom node
      inventory endpoint for baked endpoint
- [x] ISIS-0080 | F05-006 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Replace synthetic timestamps
      with provider-sourced timestamps
- [x] ISIS-0081 | F05-007 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add status mapping contract
      tests for every RunPod status
- [x] ISIS-0082 | F05-008 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add retry/circuit-breaker
      tests for rate limit, timeout, auth
- [x] ISIS-0083 | F05-009 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add provider error taxonomy
      mapping to user-safe messages and
- [x] ISIS-0084 | F05-010 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add tracing context
      propagation (`correlationId`, `projectId`,

### Workstream 06 (F06): RunPod Handler Capability Expansion (P1)

- [x] ISIS-0085 | F06-001 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add workflow-id driven
      execution mode for catalog-native
- [x] ISIS-0086 | F06-002 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add endpoint that returns
      supported workflow IDs and metadata.
- [x] ISIS-0087 | F06-003 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add typed contracts for
      major Isis categories (video, 3d,
- [x] ISIS-0088 | F06-004 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add schema validation for
      workflow overrides and input images
- [x] ISIS-0089 | F06-005 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add compatibility checks for
      required custom nodes/models before
- [x] ISIS-0090 | F06-006 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add deterministic error
      response format for unsupported
- [x] ISIS-0091 | F06-007 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add execution limits per
      workflow class
- [x] ISIS-0092 | F06-008 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add test fixtures for each
      major category.

### Workstream 07 (F07): Remove Simulated Runtime Behavior from Executors (P1)

- [x] ISIS-0093 | F07-001 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add production guard:
      simulated paths must be disabled in
- [x] ISIS-0094 | F07-002 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Texture Upscale: integrate
      real model inference backend and
- [x] ISIS-0095 | F07-003 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Gaussian Splatting:
      integrate real reconstruction pipeline and
- [x] ISIS-0096 | F07-004 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Blender Render: enforce
      Blender dependency check at startup and
- [x] ISIS-0097 | F07-005 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Mesh Processing: replace
      simulated operations with real
- [x] ISIS-0098 | F07-006 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add golden-output tests for
      each executor.
- [x] ISIS-0099 | F07-007 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add output checksum and file
      integrity verification after
- [x] ISIS-0100 | F07-008 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add performance benchmarks
      and min throughput targets per
- [x] ISIS-0101 | F07-009 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add cancellation tests for
      long-running operations.
- [x] ISIS-0102 | F07-010 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/ml-team | Add resource leak tests
      (VRAM, temp files, subprocess cleanup).

### Workstream 08 (F08): RunPod Provisioning and Drift Control (P1)

- [x] ISIS-0103 | F08-001 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/devops | Decide provisioning mechanism
      (Terraform provider/external
- [x] ISIS-0104 | F08-002 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/devops | Implement endpoint lifecycle
      automation (create/update/delete).
- [x] ISIS-0105 | F08-003 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/devops | Store endpoint desired state
      in code (GPU type, min/max workers,
- [x] ISIS-0106 | F08-004 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/devops | Add drift detection comparing
      desired state vs actual endpoint
- [x] ISIS-0107 | F08-005 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/devops | Add reconcile command for
      drift remediation.
- [x] ISIS-0108 | F08-006 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/devops | Add CI validation for runpod
      endpoint definitions before deploy.
- [x] ISIS-0109 | F08-007 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/devops | Add staged rollout by
      endpoint with canary traffic percentages.
- [x] ISIS-0110 | F08-008 | P1 | Phase 1 | M1 RunPod Productionization
      (2026-03-23 to 2026-04-17) | @oshun/devops | Add on-call runbook for
      endpoint outages and cost spikes.

### Workstream 09 (F09): Workflow Registry Persistence and Auth Hardening (P2)

- [x] ISIS-0111 | F09-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Replace in-memory storage with
      PostgreSQL persistence.
- [x] ISIS-0112 | F09-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add migrations for workflows,
      versions, templates, stars, runs,
- [x] ISIS-0113 | F09-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Remove `DEFAULT_OWNER = 'user_demo'`
      and source owner from auth
- [x] ISIS-0114 | F09-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add RBAC checks for
      create/update/delete/version operations.
- [x] ISIS-0115 | F09-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add optimistic locking/version
      conflict handling on updates.
- [x] ISIS-0116 | F09-006 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add pagination + indexing for large
      catalogs.
- [x] ISIS-0117 | F09-007 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add soft-delete + restore support for
      workflows and versions.
- [x] ISIS-0118 | F09-008 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add audit trail for all write
      operations.

### Workstream 10 (F10): Output Registry Ownership and Access Control (P2)

- [x] ISIS-0119 | F10-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Remove `DEFAULT_OWNER = 'user_demo'`
      and enforce authenticated
- [x] ISIS-0120 | F10-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add row-level authorization checks for
- [x] ISIS-0121 | F10-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add tenant scoping in all list and
      graph queries.
- [x] ISIS-0122 | F10-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add policy enforcement for
      cross-project lineage links.
- [x] ISIS-0123 | F10-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add audit logging for provenance and
      lineage mutations.

### Workstream 11 (F11): Health and Readiness Truthfulness (P2)

- [x] ISIS-0124 | F11-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Replace placeholder readiness values
      for queue/storage with real
- [x] ISIS-0125 | F11-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add Redis connectivity and queue
      liveness probe.
- [x] ISIS-0126 | F11-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add object storage read/write probe
      with timeout and retries.
- [x] ISIS-0127 | F11-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add provider health check with
      dependency-specific status
- [x] ISIS-0128 | F11-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Ensure readiness endpoint returns
      `503` on critical dependency
- [x] ISIS-0129 | F11-006 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add alerting based on readiness
      degradation.

### Workstream 12 (F12): Model Storage Presign Productionization (P2)

- [x] ISIS-0130 | F12-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Integrate real pre-signed upload URL
      generation via
- [x] ISIS-0131 | F12-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Integrate real pre-signed download URL
      generation via
- [x] ISIS-0132 | F12-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add content hash verification step on
      `completeUpload`.
- [x] ISIS-0133 | F12-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Enforce MIME/type and size constraints
      at upload and completion.
- [x] ISIS-0134 | F12-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add anti-virus/malware scan hook for
      uploaded model files.
- [x] ISIS-0135 | F12-006 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add retention/cleanup policy for
      abandoned uploads.

### Workstream 13 (F13): Deployment Configuration Drift (P2)

- [x] ISIS-0136 | F13-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Update docker compose Isis app paths
      to
- [x] ISIS-0137 | F13-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add CI check to validate `APP_PATH`
      values exist for all compose
- [x] ISIS-0138 | F13-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add smoke test that boots Isis
      services via compose and verifies
- [x] ISIS-0139 | F13-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Document local startup workflow for
      Isis services and GPU

### Workstream 14 (F14): Test Coverage Expansion for Real Execution (P2)

- [x] ISIS-0140 | F14-001 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add full E2E test: submit job -> queue
      -> worker -> output ->
- [x] ISIS-0141 | F14-002 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add E2E test for cancel during queued
      and running states.
- [x] ISIS-0142 | F14-003 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add E2E test for retry flow with
      bounded attempts.
- [x] ISIS-0143 | F14-004 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add contract test for all 45 workflows
      executing validation +
- [x] ISIS-0144 | F14-005 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add RunPod sandbox integration tests
      for submit/status/cancel.
- [x] ISIS-0145 | F14-006 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add cost-accounting correctness tests
      with fixture runtimes.
- [x] ISIS-0146 | F14-007 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add web app E2E tests covering every
      major interaction surface.
- [x] ISIS-0147 | F14-008 | P2 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add chaos tests for provider failover
      and queue outage handling.

### Workstream 15 (F15): API and SDK Contract Parity (Critical Completeness)

- [x] ISIS-0148 | F15-001 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Inventory all `@isis/client` methods and
      map to live API routes.
- [x] ISIS-0149 | F15-002 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Resolve generation route mismatches
      (`/api/v1/jobs/batch`,
- [x] ISIS-0150 | F15-003 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Resolve workflows route mismatches
- [x] ISIS-0151 | F15-004 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Resolve outputs route mismatches
      (batch-delete,
- [x] ISIS-0152 | F15-005 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Decide whether to add missing endpoints
      or deprecate unsupported
- [x] ISIS-0153 | F15-006 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add OpenAPI specs for
      generation/workflow/output services.
- [x] ISIS-0154 | F15-007 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Generate SDK from OpenAPI or add CI
      contract tests to prevent
- [x] ISIS-0155 | F15-008 | P0 | Phase 0 | M0 Foundation (2026-02-23 to
      2026-03-20) | @oshun/isis-team | Add breaking-change detection job in CI
      for API route contracts.

### Workstream 16: Security and Multi-Tenant Hardening

- [x] ISIS-0156 | SEC-001 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/security | Add auth middleware consistency across
      generation, workflow,
- [x] ISIS-0157 | SEC-002 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/security | Enforce project-level authorization on
      every read/write route.
- [x] ISIS-0158 | SEC-003 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/security | Add API key scopes for
      admin/ops/provider-control actions.
- [x] ISIS-0159 | SEC-004 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/security | Add webhook signature verification for
      provider callbacks.
- [x] ISIS-0160 | SEC-005 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/security | Add input sanitization and payload size
      limits on workflow
- [x] ISIS-0161 | SEC-006 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/security | Add structured security logs for
      sensitive operations.
- [x] ISIS-0162 | SEC-007 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/security | Add abuse controls for expensive
      generation endpoints.

### Workstream 17: Observability, Cost, and SLOs

- [x] ISIS-0163 | OBS-001 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/platform | Define SLOs for submit latency, queue
      delay, execution success
- [x] ISIS-0164 | OBS-002 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/platform | Add metrics for queue depth, stuck
      jobs, execution retries, and
- [x] ISIS-0165 | OBS-003 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/platform | Add per-provider latency and failure
      dashboards.
- [x] ISIS-0166 | OBS-004 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/platform | Add cost dashboards by endpoint,
      project, workflow, and user.
- [x] ISIS-0167 | OBS-005 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/platform | Add anomaly alerts for cost spikes and
      failure rates.
- [x] ISIS-0168 | OBS-006 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/platform | Add distributed tracing across API ->
      queue -> worker ->
- [x] ISIS-0169 | OBS-007 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/platform | Add operator CLI commands for stuck-job
      triage and replay.

### Workstream 18: Data Migration and Backfill

- [x] ISIS-0170 | MIG-001 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Design migration for existing jobs to
      new lifecycle/status
- [x] ISIS-0171 | MIG-002 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Backfill workflow IDs for historical
      jobs where missing.
- [x] ISIS-0172 | MIG-003 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Backfill provenance records for
      completed outputs where
- [x] ISIS-0173 | MIG-004 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Backfill cost data from historical
      provider logs.
- [x] ISIS-0174 | MIG-005 | P1 | Phase 2 | M2 Hardening and Parity (2026-04-20
      to 2026-05-22) | @oshun/isis-team | Add migration rollback and
      verification scripts.

### Workstream 19: Release Plan and Cutover

- [x] ISIS-0175 | REL-001 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Enable queue producer
      behind feature flag for safe rollout.
- [x] ISIS-0176 | REL-002 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Canary release to
      limited traffic/project set.
- [x] ISIS-0177 | REL-003 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Verify SLO and cost
      behavior during canary.
- [x] ISIS-0178 | REL-004 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Gradually increase
      rollout percentage with auto-rollback
- [x] ISIS-0179 | REL-005 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Conduct game-day
      exercises before full cutover.
- [x] ISIS-0180 | REL-006 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Finalize post-cutover
      validation checklist and sign-off.

### Workstream 20: Per-Workflow End-to-End Certification (45/45)

- [x] ISIS-0181 | WF-001 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | 3d-texture: certify
      schema validity, resolver mapping, executor
- [x] ISIS-0182 | WF-002 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team |
      animatediff-controlnet: certify schema validity, resolver
- [x] ISIS-0183 | WF-003 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team |
      artifact-reconstruction: certify schema validity, resolver
- [x] ISIS-0184 | WF-004 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | background-removal:
      certify schema validity, resolver mapping,
- [x] ISIS-0185 | WF-005 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | barnsley-fern:
      certify schema validity, resolver mapping,
- [x] ISIS-0186 | WF-006 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | base-avatar: certify
      schema validity, resolver mapping, executor
- [x] ISIS-0187 | WF-007 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | batch-resize:
      certify schema validity, resolver mapping, executor
- [x] ISIS-0188 | WF-008 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | batch-watermark:
      certify schema validity, resolver mapping,
- [x] ISIS-0189 | WF-009 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | buddhist-thangka:
      certify schema validity, resolver mapping,
- [x] ISIS-0190 | WF-010 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | celtic-knotwork:
      certify schema validity, resolver mapping,
- [x] ISIS-0191 | WF-011 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | christian-icon:
      certify schema validity, resolver mapping,
- [x] ISIS-0192 | WF-012 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | concept-explainer:
      certify schema validity, resolver mapping,
- [x] ISIS-0193 | WF-013 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | consciousness-map:
      certify schema validity, resolver mapping,
- [x] ISIS-0194 | WF-014 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team |
      consistent-character: certify schema validity, resolver mapping,
- [x] ISIS-0195 | WF-015 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | cosmetic-layer:
      certify schema validity, resolver mapping,
- [x] ISIS-0196 | WF-016 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | egyptian-hieratic:
      certify schema validity, resolver mapping,
- [x] ISIS-0197 | WF-017 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | environment-map:
      certify schema validity, resolver mapping,
- [x] ISIS-0198 | WF-018 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | face-swap: certify
      schema validity, resolver mapping, executor
- [x] ISIS-0199 | WF-019 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | flame-fractal:
      certify schema validity, resolver mapping,
- [x] ISIS-0200 | WF-020 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | fractal-art-fusion:
      certify schema validity, resolver mapping,
- [x] ISIS-0201 | WF-021 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | fractal-morph:
      certify schema validity, resolver mapping,
- [x] ISIS-0202 | WF-022 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | fractal-zoom:
      certify schema validity, resolver mapping, executor
- [x] ISIS-0203 | WF-023 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | guided-journey:
      certify schema validity, resolver mapping,
- [x] ISIS-0204 | WF-024 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | hindu-deity: certify
      schema validity, resolver mapping, executor
- [x] ISIS-0205 | WF-025 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | image-to-video:
      certify schema validity, resolver mapping,
- [x] ISIS-0206 | WF-026 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | islamic-geometric:
      certify schema validity, resolver mapping,
- [x] ISIS-0207 | WF-027 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | julia: certify
      schema validity, resolver mapping, executor
- [x] ISIS-0208 | WF-028 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | lecture-scene:
      certify schema validity, resolver mapping,
- [x] ISIS-0209 | WF-029 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | lorenz-attractor:
      certify schema validity, resolver mapping,
- [x] ISIS-0210 | WF-030 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | mandala-3d: certify
      schema validity, resolver mapping, executor
- [x] ISIS-0211 | WF-031 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | mandala-animated:
      certify schema validity, resolver mapping,
- [x] ISIS-0212 | WF-032 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | mandala-generator:
      certify schema validity, resolver mapping,
- [x] ISIS-0213 | WF-033 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team |
      mandala-personalized: certify schema validity, resolver mapping,
- [x] ISIS-0214 | WF-034 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | mandelbrot: certify
      schema validity, resolver mapping, executor
- [x] ISIS-0215 | WF-035 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | meditation-scene:
      certify schema validity, resolver mapping,
- [x] ISIS-0216 | WF-036 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | nft-art: certify
      schema validity, resolver mapping, executor
- [x] ISIS-0217 | WF-037 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | print-ready: certify
      schema validity, resolver mapping, executor
- [x] ISIS-0218 | WF-038 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | rarity-enhancer:
      certify schema validity, resolver mapping,
- [x] ISIS-0219 | WF-039 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | shamanic-vision:
      certify schema validity, resolver mapping,
- [x] ISIS-0220 | WF-040 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | spiritual-teacher:
      certify schema validity, resolver mapping,
- [x] ISIS-0221 | WF-041 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | stable-zero123:
      certify schema validity, resolver mapping,
- [x] ISIS-0222 | WF-042 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | style-transfer:
      certify schema validity, resolver mapping,
- [x] ISIS-0223 | WF-043 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | upscale-enhance:
      certify schema validity, resolver mapping,
- [x] ISIS-0224 | WF-044 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | visionary-art:
      certify schema validity, resolver mapping,
- [x] ISIS-0225 | WF-045 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/ml-team | yantra-generator:
      certify schema validity, resolver mapping,

### Workstream 21: Interaction and User-Journey Coverage (No Interaction Missed)

- [x] ISIS-0226 | UX-001 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Anonymous user
      journey: confirm blocked access to protected
- [x] ISIS-0227 | UX-002 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Authenticated job
      create -> monitor -> cancel journey works for
- [x] ISIS-0228 | UX-003 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Authenticated
      workflow authoring journey works (create ->
- [x] ISIS-0229 | UX-004 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Authenticated
      output journey works (discover -> provenance
- [x] ISIS-0230 | UX-005 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Model management
      journey works (register -> upload -> complete ->
- [x] ISIS-0231 | UX-006 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Provider failover
      journey is visible and understandable to
- [x] ISIS-0232 | UX-007 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | RunPod quota/cost
      warning journey is visible before expensive
- [x] ISIS-0233 | UX-008 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Failure recovery
      journey works (retry, clone config, report
- [x] ISIS-0234 | UX-009 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team |
      Cross-project/tenant boundaries are enforced in every user
- [x] ISIS-0235 | UX-010 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/isis-team | Every UI
      interaction has corresponding API route test and

### Workstream 22: Operational Resilience and Compliance Completion

- [x] ISIS-0236 | OPS-001 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add database
      backup/restore runbooks and recovery time
- [x] ISIS-0237 | OPS-002 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add secrets rotation
      procedures for RunPod API keys and webhook
- [x] ISIS-0238 | OPS-003 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add disaster recovery
      drill for provider outage (RunPod
- [x] ISIS-0239 | OPS-004 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add budget guardrails
      and automatic throttling when RunPod spend
- [x] ISIS-0240 | OPS-005 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add data retention
      and deletion compliance checks for outputs,
- [x] ISIS-0241 | OPS-006 | P1 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/devops | Add post-incident
      review template specific to generation

### Web App Feature Parity Checklist (No Feature Missed)

- [x] ISIS-0242 | PARITY-001 | P1 | Phase 2 | M2 Hardening and Parity
      (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every method in
      `GenerationResource` is accessible via UI
- [x] ISIS-0243 | PARITY-002 | P1 | Phase 2 | M2 Hardening and Parity
      (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every method in
      `WorkflowsResource` is accessible via UI
- [x] ISIS-0244 | PARITY-003 | P1 | Phase 2 | M2 Hardening and Parity
      (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every method in
      `OutputsResource` is accessible via UI flow.
- [x] ISIS-0245 | PARITY-004 | P1 | Phase 2 | M2 Hardening and Parity
      (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every model management
      endpoint is accessible via UI flow.
- [x] ISIS-0246 | PARITY-005 | P1 | Phase 2 | M2 Hardening and Parity
      (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every RunPod operations
      endpoint is accessible via UI or
- [x] ISIS-0247 | PARITY-006 | P1 | Phase 2 | M2 Hardening and Parity
      (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every long-running action
      has user-visible progress state.
- [x] ISIS-0248 | PARITY-007 | P1 | Phase 2 | M2 Hardening and Parity
      (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every destructive action
      has confirmation + undo/restore path
- [x] ISIS-0249 | PARITY-008 | P1 | Phase 2 | M2 Hardening and Parity
      (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every page has
      empty/loading/error states.
- [x] ISIS-0250 | PARITY-009 | P1 | Phase 2 | M2 Hardening and Parity
      (2026-04-20 to 2026-05-22) | @oshun/isis-team | Every UI action emits
      analytics/audit events.

### Mandatory Exit Gates

- [x] ISIS-0251 | GATE-001 | P0 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | End-to-end
      production-like workflow run passes for each catalog
- [x] ISIS-0252 | GATE-002 | P0 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | 45/45 workflow
      definitions pass canonical schema and registry
- [x] ISIS-0253 | GATE-003 | P0 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | No simulated
      output generation is reachable in production
- [x] ISIS-0254 | GATE-004 | P0 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | RunPod cost and
      history data are complete and queryable per
- [x] ISIS-0255 | GATE-005 | P0 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | Isis web app
      demonstrates full feature parity in UAT checklist.
- [x] ISIS-0256 | GATE-006 | P0 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | Security review
      complete with no critical/high unresolved
- [x] ISIS-0257 | GATE-007 | P0 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | Observability
      dashboards and alerts are live and validated.
- [x] ISIS-0258 | GATE-008 | P0 | Phase 3 | M3 Certification and Operational
      Closure (2026-05-25 to 2026-06-26) | @oshun/core-team | Regression suite
      is green on CI for backend, worker, infra, and
