Phase 52 completion criterion: Training materials complete.
This certification is generated from @neith/qa audits of the currently
implemented Neith footprint. It verifies that the repository ships a
discoverable training program for the domain-level onboarding path plus the
implemented release, QA, and Linux surfaces.
Summary#
- Completion status: PASS
- Certified training surfaces: 5/5
- Domain index links present: yes
- Oshun reference links present: yes
- Published certification present: yes
- Missing paths: 0
- Missing section markers: 0
- Missing domain index links: 0
- Missing Oshun reference links: 0
Surface Coverage#
- Domain training surfaces: 2
- Release training surfaces: 1
- QA training surfaces: 1
- Linux training surfaces: 1
- Overview documents: 1
- Training guides: 4
Certified Training Surfaces#
| Area | Kind | Path | Detail |
|---|---|---|---|
| domain | overview | docs/domains/neith/README.md |
Standalone Neith docs hub linking the phase-wide training program plus the implemented package tracks. |
| domain | training-guide | docs/domains/neith/training/README.md |
Top-level Neith training program describing role-based learning tracks for the implemented footprint. |
| release | training-guide | docs/domains/neith/release/training/README.md |
Hands-on release-operations curriculum covering pipeline, rollout, distribution, and publication workflows. |
| qa | training-guide | docs/domains/neith/qa/training/README.md |
Training path for contributors building deterministic auditors and published certification ledgers. |
| linux | training-guide | docs/domains/neith/linux/training/README.md |
Training path for engineers validating flake, module, ISO, update, and recovery workflows on Neith Linux. |
Audit Result#
The implemented Neith footprint has a complete training curriculum for the domain-level onboarding path plus the release, QA, and Linux surfaces, and those materials are linked from both the standalone Neith docs hub and the Oshun-local reference pages.
Interpretation#
For Phase 52, training-material completeness is scoped to the Neith surfaces that are actually implemented in the repository today. The gate is only satisfied when the domain hub, release workflows, QA certification work, and Neith Linux platform operations each have structured onboarding material with explicit labs, evidence expectations, and discoverability.