Eve library

E2E Test Coverage Certification

Guide

Revision 1

On this page

Phase 52 completion criterion: E2E test coverage > 60%.

This certification is generated from @neith/qa audits of the dedicated Phase 52 E2E suite in @neith/release. It verifies that the implemented release/distribution control plane has public-API end-to-end coverage above the integration layer rather than relying on internal-module tests.

Summary#

  • Threshold met: PASS
  • E2E coverage: 100% (7/7 scenarios)
  • Required coverage: > 60%
  • Test files scanned: 1
  • Dedicated Nx E2E target present: yes
  • E2E suite documented: yes
  • Public API boundary enforced: yes
  • Missing paths: 0
  • Missing scenario markers: 0
  • Missing project targets: 0
  • Missing documentation sections: 0
  • Missing public API boundaries: 0

Coverage Areas#

  • Release campaign scenarios: 1
  • Security response scenarios: 1
  • Artifact distribution scenarios: 1
  • Consumer update scenarios: 1
  • Commercialization scenarios: 1
  • Platform publication scenarios: 1
  • Enterprise delivery scenarios: 1

Certified E2E Scenarios#

Area Scenario Path Detail
release-campaign e2e-stable-release-campaign libs/neith/release/tests/e2e.spec.ts Stable release train execution from approval through staged rollout and published download inventory using only the public package API.
security-response e2e-security-patch-recovery-campaign libs/neith/release/tests/e2e.spec.ts Critical advisory handling through hotfix planning, rollback rehearsal, and mandatory security update publication at the package boundary.
artifact-distribution e2e-linux-repository-distribution-journey libs/neith/release/tests/e2e.spec.ts Linux artifact generation, checksum/signature verification, and repository installation guidance exercised as a complete public-API journey.
consumer-update e2e-consumer-update-recovery-journey libs/neith/release/tests/e2e.spec.ts Consumer update discovery, verified download, delta patch orchestration, and offline recovery fallback executed end to end.
commercialization e2e-trial-conversion-journey libs/neith/release/tests/e2e.spec.ts Trial lifecycle, extension, paid conversion, and free-tier upsell/pricing flows covered through the supported release package interface.
platform-publication e2e-web-marketplace-publication-journey libs/neith/release/tests/e2e.spec.ts Web deployment, accessibility certification, Docker publication, and cloud marketplace preparation executed through the public release API.
enterprise-delivery e2e-enterprise-procurement-rollout-journey libs/neith/release/tests/e2e.spec.ts Enterprise catalog publication, deployment planning, site compliance, and volume licensing exercised as a full package-boundary journey.

Audit Result#

All required Phase 52 E2E scenarios are present, the dedicated E2E target exists, the release package documentation points to the suite, and the scenarios stay on the supported ../src/index.js package boundary. The current repo state exceeds the required E2E coverage threshold.

Interpretation#

Phase 52 E2E coverage is measured against public-API release journeys that an operator, enterprise administrator, or downstream integrator would actually execute. The gate is only satisfied when those journeys are codified as dedicated E2E tests and kept isolated from internal module imports.