Completion audit#

Phase 163 defines 150 implementation requirements across eleven product areas and ten validation requirements. The implementation is present in thirteen focused Rust workspaces under libs/neith/vp-*, including the shared vp-core types and vp-testing release-gate harness. A source audit found no todo!, unimplemented!, ignored test, placeholder marker, or unused-code allowance in phase-owned Rust sources.

Phase area Authoritative package Passing tests
shared contracts vp-core 34
163.1 render cluster vp-cluster 109
163.2 LED wall vp-wall 52
163.3 camera tracking vp-camera 93
163.4 frustum rendering vp-frustum 40
163.5 colour pipeline vp-color 81
163.6 scene pipeline vp-scene 97
163.7 mixed reality vp-mr 97
163.8 operator control vp-control 75
163.9 broadcast studio vp-broadcast 37
163.10 capture and playback vp-record 49
163.11 VFX handoff vp-pipeline 34
163.12 validation vp-testing 44

All 842 tests pass with zero failures and zero ignored cases. Every package passes rustfmt, strict all-target clippy, and a release build. The audit applied the previously missing canonical rustfmt output across the phase-owned sources. No browser, mobile, or editor UI changed, so Playwright and mobile automation are not applicable to this task.

Open external acceptance gates#

The four unchecked ledger entries are deliberately not represented as passes. The audit hardened all locally actionable acquisition and grading work while keeping production certification fail-closed:

Requirement Locally complete evidence contract External evidence still required
163.12.4 grade_node_trace binds the result to build/run/host, node and GPU identities, exact resolution, positive finite frame timings, configurable minimum duration, frame deadline, achieved FPS, and drop budget. Synthetic traces may meet the metric but cannot set certified. A live 3840×2160, 120 Hz capture of the deployed multi-GPU render node for the configured sustained duration.
163.12.8 validate_capture grades independently measured focus-distance, focal-length, and iris sweeps with camera/lens model and serial identities, monotonic raw counts, per-axis tolerances, minimum sampling, and live provenance. validate_matrix requires exactly one passing ARRI, Sony, and RED capture. It does not infer compatibility from a generic linear vendor profile. Physical ARRI LDS, Sony, and RED camera/lens sweeps. Each vendor must produce a certified report.
163.12.9 grade_dogfood verifies the Phase 27 production identity, SHA-256-addressed staged artifacts, ordered setups, unique take IDs, per-setup take counts, and live provenance. The production Obsidian scene/media bundle and an executed volume shoot.
163.12.10 grade_broadcast_soak requires an identified fleet/programme, strictly increasing finite samples, configurable sample density and maximum gap, eight-hour duration, bounded least-squares memory slope, zero errors, and the drop budget. A real eight-hour broadcast programme run on the production fleet.

All four contracts use shared CaptureProvenance. A deterministic fixture is explicitly tagged synthetic, can exercise pass/fail math in unit tests, and can never produce certified: true. This prevents a short benchmark, lower resolution trace, generic lens model, fabricated Obsidian completion, or sparse two-point soak trace from being promoted to production evidence.

On-set entry point#

The release build emits vp-validate, a file-oriented CLI that writes a JSON report and uses exit status 0 only for certified live evidence, 2 for valid but non-certifying/failing evidence, and 1 for malformed inputs:

bash
vp-validate throughput <trace.json> [policy.json]
vp-validate lens <vendor-matrix.json>
vp-validate dogfood <manifest.json> <run.json>
vp-validate soak <trace.json> [policy.json]

The CLI deserializes the same public, serde-backed contracts exercised by the unit tests; there is no separate permissive parsing path.

Verification#

The following commands were run sequentially for every phase manifest from vp-core through vp-testing:

bash
cargo fmt --manifest-path <manifest> -- --check
cargo clippy --manifest-path <manifest> --all-targets -- -D warnings
cargo test --manifest-path <manifest> --all-targets
cargo build --release --manifest-path <manifest>

All commands passed. Verification was serialized and supervised on a 15 GiB host with 31 GiB swap while an unrelated BFF development watcher was active; available memory remained above 11 GiB. No full-workspace Nx gate was run.