## Phase 14: Documentation & Cleanup

### 14.1 Architecture Documentation ✅

- [x] **14.1.1** Create ARCHITECTURE.md at oshun root
- [x] **14.1.2** Document domain responsibilities
- [x] **14.1.3** Create architecture diagrams
- [x] **14.1.4** Document data ownership matrix
- [x] **14.1.5** Document event flows

### 14.2 API Documentation ✅

- [x] **14.2.1** Generate OpenAPI docs for each domain
- [x] **14.2.2** Set up unified API documentation site
- [x] **14.2.3** Add SDK usage examples
- [x] **14.2.4** Document authentication flows

### 14.3 Developer Guides

- [x] **14.3.1** Create getting started guide for monorepo
- [x] **14.3.2** Create guide for adding new services
- [x] **14.3.3** Create guide for adding new libraries
- [x] **14.3.4** Create guide for cross-domain integration
- [x] **14.3.5** Document Nx commands and workflows

### 14.4 Migration Guides

- [x] **14.4.1** Create migration guide for Lilith developers
- [x] **14.4.2** Create migration guide for Yemaya developers
- [x] **14.4.3** Document breaking changes
- [x] **14.4.4** Create FAQ for common migration issues

### 14.5 README Updates

- [x] **14.5.1** Create oshun/README.md with monorepo overview
- [x] **14.5.2** Update README for each domain
- [x] **14.5.3** Add badges for CI status, coverage, etc.
- [x] **14.5.4** Add quick start instructions

### 14.6 Cleanup

- [x] **14.6.1** Remove empty directories
- [x] **14.6.2** Remove unused configuration files
- [x] **14.6.3** Remove deprecated code
- [x] **14.6.4** Clean up TODO comments
- [x] **14.6.5** Run final lint and format

### 14.7 Final Validation

- [ ] **14.7.1** Build the affected projects clean. Restated 2026-09-18:
      `nx run-many --target=build --all` (1729 projects) is banned in a worktree
      per CLAUDE.md and thrashes the 15 GB box. Instead confirm the repo's build
      CI is green on `main` (the per-project affected graph run by
      `.github/workflows/ci.yml` / `oshun-ci.yml`), and fix each failing touched
      project with its own `npx nx build <project>` or `npx tsc --noEmit`. The
      prior revert was due to real Isis build failures — those must be fixed.
      Verify: the build job is green on `main` at a named SHA, recorded here.
- [ ] **14.7.2** Test the affected projects clean. Restated 2026-09-18: replace
      `nx run-many --target=test --all` with the affected-graph test job in CI,
      fixing each failing touched project with `npx vitest run <path>`. Verify:
      the test job is green on `main` at a named SHA.
- [ ] **14.7.3** Lint the affected projects clean. Restated 2026-09-18: replace
      `nx run-many --target=lint --all` with the affected-graph lint job in CI,
      fixing each failing touched project with `npx eslint <path>`. Verify: the
      lint job is green on `main` at a named SHA.
- [x] **14.7.4** Verify all Docker builds succeed
  - Docker infrastructure verified working locally
  - Base image build (docker/Dockerfile.node) succeeds
  - container-build.yml workflow configured for CI/CD
  - Affected apps built via:
    `pnpm nx show projects --affected --type=app --with-target=container`
- **14.7.5** Deploy to staging environment. _Withdrawn 2026-09-18: this phase's
  Kubernetes/ArgoCD staging cut-over is superseded — deployment is now the
  single-box Hetzner compose plane (`deploy-hetzner.yml`), and this
  documentation/cleanup phase's migration finished in spring 2026._
- **14.7.6** Run smoke tests in staging. _Withdrawn 2026-09-18: depended on
  14.7.5; the Hetzner deploy workflow runs its own public smoke step._
- [x] **14.7.7** Document any remaining issues
  - Original notes (resolved): Isis Anthropic SDK type compatibility, Isis
    Prisma client generation. Verified passing on current branch.
  - Original notes (still in effect): ESLint plugin excludes `apps/**` due to
    flat-config compatibility; broad lint cleanup pending.
  - Backlog from this session (open items in 14.7.1):
    - The 2026-04-23 fail-fast full build gate still fails. Observed failure
      batches include `@hathor/veilborn-core`, `@lilith/real-time-sync`,
      `@lilith/data-governance`, `@lilith/teacher-blessing`,
      `@lilith/group-meditation`, `@lilith/daily-content`,
      `@lilith/staking-mechanism`, `@lilith/catalog`, `@lilith/blockchain`,
      `@lilith/notification`, and `@lilith/progress-sync`.
    - `bellona-sdk-cpp` requires system `cmake` install.
    - `@lilith/service-lib` has ~10+ TS errors (mock surface drift,
      `verbatimModuleSyntax` type-only imports, consent-purpose narrowing) —
      needs surgical per-file fixes.
    - End-to-end build/test/lint sweep across all 1900+ Nx projects not yet
      executed; expect additional individual project failures to surface, each
      needing focused remediation.

### 14.8 Release

- **14.8.1** Create release branch. _Withdrawn 2026-09-18: “Phase 14 release” is
  a migration that finished in spring 2026; the live release train is V1.0
  (`libs/oshun/navigation/src/release-scope.ts`), not a phase-14 cut._
- **14.8.2** Update version numbers. _Withdrawn 2026-09-18: part of the finished
  phase-14 migration release; superseded by the V1.0 release train._
- **14.8.3** Generate changelog. _Withdrawn 2026-09-18: same as 14.8.1._
- **14.8.4** Create release tag. _Withdrawn 2026-09-18: same as 14.8.1._
- **14.8.5** Deploy to production. _Withdrawn 2026-09-18: production deploy is
  the Hetzner `deploy-hetzner.yml` `approve-production` path, not a phase-14
  step._
- **14.8.6** Monitor production metrics. _Withdrawn 2026-09-18: production
  monitoring is the Hetzner observability plane (`infra/hetzner/observability`),
  not a phase-14 step._
- **14.8.7** Announce migration completion. _Withdrawn 2026-09-18: the phase-14
  migration finished in spring 2026; there is no pending migration to announce._

---

## Summary Statistics

| Phase                                       | Task Count |
| ------------------------------------------- | ---------- |
| Phase 0: Pre-Migration Setup                | 17         |
| Phase 1: Repository & Package Manager       | 21         |
| Phase 2: Nx Workspace Initialization        | 43         |
| Phase 3: Shared Foundation Libraries        | 60         |
| Phase 4: Contracts & Schema Layer           | 38         |
| Phase 5: Isis (Generative Factory)          | 72         |
| Phase 6: Sophia (Research & Knowledge)      | 58         |
| Phase 7: Hathor (Worldbuilding & Narrative) | 62         |
| Phase 8: Bellona (Engine & Build/Bridge)    | 92         |
| Phase 9: Yemaya (Creative Studio)           | 87         |
| Phase 10: Lilith (Consciousness Experience) | 96         |
| Phase 11: Cross-Domain Integration          | 31         |
| Phase 12: CI/CD & DevOps                    | 52         |
| Phase 13: Testing & Validation              | 31         |
| Phase 14: Documentation & Cleanup           | 36         |
| **TOTAL**                                   | **796**    |

---

## Dependency Order

The phases should generally be executed in order, but some can be parallelized:

1. **Phase 0** must complete first
2. **Phase 1-2** must be sequential
3. **Phase 3-4** must complete before domain phases
4. **Phases 5-8** (capability domains) can be parallelized
5. **Phases 9-10** (product domains) can be parallelized after 5-8
6. **Phase 11** requires 5-10 to be substantially complete
7. **Phases 12-14** can overlap with later parts of 5-11

---

## Notes

- Tasks marked with (RECOMMEND:) indicate the recommended approach per the
  recommendation document
- Some tasks may be skipped if not applicable to your specific needs
- Time estimates are intentionally omitted - focus on sequential completion
- This checklist can be tracked via GitHub issues or project management tools
- Consider creating GitHub milestones for each phase

---
