Historical task source. The Eve task board holds current task state.

Verified on 2026-07-14 in /mnt/volume300/workspace/oshun-lt-2.

Completion audit#

  • TODOS/phase-128.md contains no unchecked tasks. The ten implementation sections map to ten published libraries: materials-platform, crystal-viewer, electronic-viz, materials-dashboard, materials-notebooks, discovery-agents, materials-collab, materials-graph, materials-education, and materials-infra.
  • The repository contains the TypeScript, Rust, Python, shader, parser, connector, orchestration, export, and test artifacts named by the phase. A source scan found no unimplemented stubs or actionable TODO/FIXME markers in these libraries.
  • The ten Vitest suites contain 224 declared test cases. All ten Nx test targets pass after migration from the deprecated @nx/vite:test executor to @nx/vitest:test.
  • All ten strict TypeScript type-check targets pass. Their library configs now opt out of composite mode so workspace source aliases are checked without the false TS6307 cross-project file-list failures that previously made the targets unusable.
  • All ten ESLint targets pass. Unsafe non-null assertions found during the audit were replaced with explicit narrowing, and the duplicated elastic import and Python unused import were removed.
  • All ten package build targets pass sequentially with task dependencies excluded. The aggregate dependency-aware build currently stops in the pre-existing @kalika/code-interfaces:build target on that library's own TS6307 configuration error, before any Phase 128 build runs; this is outside Phase 128 and does not contradict the direct package build evidence.
  • No Phase 128 package contains a TSX/JSX application surface, and no app or E2E source imports these libraries. Consequently there is no mounted browser route for applicable Playwright coverage in the current repository state.

Correctness improvements made during verification#

  • Ternary phase-diagram projection now normalizes arbitrary composition ratios, with a regression test proving that 2:1:1 and 0.5:0.25:0.25 project to the same point.
  • Cache, graph traversal, parser, notebook dependency, experimental sync, reproducibility, and glTF material paths now narrow optional values explicitly instead of relying on non-null assertions.

Native and Python verification#

  • Rust: cargo test --offline passed 25 unit tests and doc tests; cargo clippy --offline --all-targets -- -D warnings passed; cargo build --release --offline passed.
  • Optional Rust surfaces: cargo check --offline --features gpu,napi passed, validating the wgpu/naga and napi-rs feature graph.
  • Browser native module: wasm-pack build --target web --out-dir ../src/wasm --release --offline passed for wasm32-unknown-unknown and completed wasm-opt optimization.
  • Python: pytest passed 10 tests with one intentional optional-pymatgen skip; Ruff, mypy, and compileall all passed.

Resource-safe execution#

The host had 15 GiB RAM and 31 GiB swap. All Nx targets used --parallel=1, and tests, typechecking, linting, package builds, Rust builds, and Python checks were run as separate gates. Available memory remained above the required safety floor throughout verification.