Historical task source. The Eve task board holds current task state.
Phase 103 completion evidence#
Audited on 2026-07-12 against TODOS/phase-103.md and the current source tree.
All 45 phase requirements are checked and have corresponding exported
implementations and automated specifications in the four Phase 103 libraries.
| Requirement group | Implementation root | Verification corpus |
|---|---|---|
| 103.1 numerical engine and GPU kernels | libs/kalika/numerical-engine/crates/kalika-numerical-engine-core/src/lib.rs |
Rust workspace unit tests (dense, sparse, nonlinear, GPU, ODE/PDE, and Monte Carlo kernels) |
| 103.2 differential-equation solvers | libs/kalika/numerical-engine/crates/kalika-numerical-engine-core/src/lib.rs, libs/kalika/numerical/src |
Rust unit tests and focused numerical Vitest specifications |
| 103.3 Monte Carlo methods | libs/kalika/numerical-engine/crates/kalika-numerical-engine-core/src/lib.rs |
Rust unit tests plus monte-carlo-validation.spec.ts |
| 103.4 tensor networks | libs/kalika/tensor-networks/src |
Seven Vitest specification files covering contractions, MPS, DMRG, MERA, PEPS, lattice gauge networks, and XXZ benchmarks |
| 103.5 HPC orchestration | libs/kalika/hpc-orchestrator/src |
Four Vitest specification files covering scheduling, distributed collectives, caching, and resource monitoring |
Verification record#
The following resource-conservative gates passed on 2026-07-12:
- numerical-engine Rust workspace tests: 132 passed
- eight focused
@kalika/numericalPhase 103 specification files: 89 passed - complete
@kalika/tensor-networkssuite: 35 passed - complete
@kalika/hpc-orchestratorsuite: 24 passed - targeted lint and build gates for all four Phase 103 projects
- Rust WASM typecheck for the portable numerical-engine target
git diff --check
The complete @kalika/numerical suite was also attempted. Its unrelated HDF5
robustness subprocess emitted native HDF5 diagnostics and exited without a
Vitest assertion summary; the eight Phase 103 numerical specifications were
therefore run directly with one worker and all passed. Repository searches found
no unchecked task in TODOS/phase-103.md.